ARCC CEQA NOA filings
Schedule time to view CEQA and other postings in the County Clerk’s Office (Room 234) here.
These documents may not work with all assistive technology and are being remediated. For alternative formats, please email the County Clerk or phone 415-473-6772. To use the California relay service, dial 711.
- April 12 2024 Phoenix Bon Tempe Connection Project — 04122024-phoenix-bon-tempe-connection-project.pdf (887.21 KB) — — Notice of Availability and Notice of Intent to Adopt a Mitigated Negative Declaration.
- April 15 2024 Notice of Availability of the Draft Environmental Impact Report — 04152024-noa-of-eir-for-terra-linda-high-school-capital-improvements-project.pdf (207.24 KB) — — Notice of Availability of the Draft Environmental Impact Report for the Terra Linda High School Capital Improvements Project (SCH No. 2023080737).
- April 25 2024 Notice of Availability For General Waste Discharge Requirements — 04252024-noa-for-general-waste-discharge-requirments-for-federal-lands-in-the-north-coast-region.pdf (52.22 KB) — — Notice of Availability - opportunity to comment on a draft environmental impact report for General Waste Discharge Requirements for federal lands in the north coast region.
- Aug 15 2024 North Coast Land Holdings Master Plan — 08152024-north-coast-land-holdings-master-plan-and-community-plan-amendment-project.pdf (139.58 KB) — — Notice of Completion and Public Hearing Draft Environmental Impact Report for the North Coast Land Holdings Master Plan and Community Plan Amendment Project.
- Aug 16 2024 Notice of Preparation for the Draft EIR for City of Sausalito — 08162024-nop-and-scoping-meeting-for-the-draft-eir-for-city-of-sausalito-amended-6th-cycle-housing-element.pdf (5.42 MB) — — Notice of Preparation and scoping meeting for the draft EIR for City of Sausalito amended 6th cycle housing element.
- Aug 21 2024 Notice of Completion of Water Main Installation — 08212024-nmwd-hq-rw-extension-from-redwood-blvd-project.pdf (856.36 KB) — — Notice of completion of installation of recylced water main, removal of existing abandoned gas line - RW Extension Redwood Blvd. project.
- Aug 30 2024 Notice of Intent to Adopt a Negative Declaration — 08302024-noi-adopt-a-nd-proposed-2025-revisions-to-the-energy-code-for-residential-and-nonresidential-buildings.pdf (2.31 MB) — — Notice of Intent to Adopt a Negative Declaration, Availability of the Initial Study and Proposed Negative Declaration, and Start of the Public Comment Period.
- August 25 2024 Notice of General Rate Case Application — 08252024-notice-of-general-rate-case-application-filed-by-california-water-service-company.pdf (1.76 MB) — — Notice of General rate case application filed by California Water Service Company for an order authorizing it to increase rates for water service by 17.1% in test year 2026 with further increases in subsequent years.
- Dec 20 2023 Mitigated Negative Declaration for Farmers Market — 12202023-noa-mnd-for-permanent-farmers-market-at-the-marin-civic-center-campus.pdf (127.23 KB) — — Notice of Availability, Mitigated Negative Declaration for the Permanent Farmers Market at the Marin Civic Center Campus.
- Dec 21 2023 NOA Addendum to 2018 EIR — 12212023-noa-addendum-to-2018-eir-for-san-anselmo-flood-risk-reduction-project.pdf (147.44 KB) — — Addendum to 2018 Environmental Impact Report (EIR) for the San Anselmo Flood Risk Reduction Project (Building Bridge #2).